Yadavaran field development enters new phase; official production from first well of capacity expansion plan

According to Energy Press, citing the Petroleum Engineering and Development Company, Ali Akbar Moshtaghqi, referring to the importance of this stage, said: The commissioning of the F43 well marks a new stage in the Yadavaran field production increase plan and plays an important role in maintaining and sustaining oil production. He added: All drilling, completion and commissioning operations of this well have been carried out by relying on the capabilities of domestic engineers and specialists and in full compliance with safety standards. Well F43, as the first well in the Yadavaran field production increase plan, officially entered production after successfully conducting final tests and approving technical units. Production of this well has begun in safe and stable conditions, and all stages of its drilling and commissioning have been carried out under the supervision of specialized departments and in compliance with technical and environmental requirements.
Tags:Yadavaran
- Comments sent by you will be published after approval by site administrators.
- Comments that contain slander will not be published.
- Comments that are not in Persian or not related to the news will not be published.
Comments
Total comments : 0 Awaiting review : 0 Date: 0