Two new contractors join Yadavaran development project

According to Energy Press, citing the Petroleum Engineering and Development Company, Ali Akbar Moshtaghqi, referring to the serious competition between companies in tenders related to surface work packages in the Yadavaran Oil Field Development Plan, stated: The tenders were held based on the instructions of the Ministry of Oil and with an emphasis on three indicators: price, technical capacity and execution records. The proposals of Bina Design and Construction Company and Khatam al-Anbiya (PBUH) Headquarters met the necessary conditions to win from an economic and technical perspective.
Regarding the separation of the packages, he said: The package of 14 wells is mainly located in the southern part of the field, which is more challenging due to the high groundwater level. In contrast, the package of 10 wells is located in the northern and northwestern areas of the field.
The executor of the Yadavaran Oil Field Development Plan announced the division of labor between the two contractors with the aim of accelerating the construction of surface facilities and pipelines and reducing the field development time, adding: “Both contractors will enter the workshop equipment stage in late Azar 1404, and the installation of wellhead facilities and the construction of flow pipelines will begin in early January.”
Tags:Yadavaran
- Comments sent by you will be published after approval by site administrators.
- Comments that contain slander will not be published.
- Comments that are not in Persian or not related to the news will not be published.
Comments
Total comments : 0 Awaiting review : 0 Date: 0