The Deputy Minister of Engineering, Research and Technology of the Ministry of Oil said: "Despite the existing problems, the plan to revive low-yield wells has been evaluated as an important step towards improving oil and gas production technologies."
During the years, with the efforts of the company's technical assistants, more than 5 wells have been submitted after joint field visits, completion of checklists and the arrangement of temporary and permanent minutes to oil companies in central Iran, Pars oil and gas, engineering and oil development (text), oil and gas, Iranian oil and oil.
The CEO of the National Iranian Drilling Company announced the achievement of drilling and completing 100 wells in 1403 and said: "Localizing strategic equipment, manufacturing domestic rigs, and increasing the share of domestic manufacturing are among the company's strategic priorities, which have been accompanied by foreign exchange savings and reducing dependence."