The spokesperson of the water industry emphasized the importance of reducing the extraction of underground water resources and said: 422 plains of the country are currently on the prohibited and prohibited critical list due to excessive extraction, and 359 plains are facing the risk of subsidence.
The 6% increase in the water input to the country's dams and the 6% increase in the water output from the dams compared to the water year 2022-2023 and the end of the water year 2023-2024 with a 12% increase in the reserves of the dams compared to the same time last year are important indicators of the water year that has ended.
The case of school sewage is open for 2 thousand schools in Tehran and after the warning water cut off of some of these schools, agreements were made between ABFA and education to solve this issue.
According to the latest statistics, the situation of underground water resources in Iran is extremely critical. About 5 billion cubic meters of non-renewable water and aquifers in the country decrease annually.
According to the latest statistics on the state of the country's important dams, the volume of water in the country's reservoirs has increased by 11% compared to last year, and the amount of rainfall has also increased by 19% compared to the same period last year.
Director General of Water and Wastewater Health Office of Abfay said: In order to improve the quality of drinking water, the installation, commissioning and calibration of online systems for measuring residual free chlorine at border terminals have been done.
The managing director of Mallard Waterworks said: The problem of water interruption for the people of Mallard region is due to the drop in electricity voltage.
The CEO of Region 5 Water and Wastewater Company has announced that the per capita consumption of water in Tehran is higher than the average, and in this regard, to deal with high-consumption subscribers, a water restriction plan has been considered.
The deputy director of water exploitation and development of Tehran Province Water and Sewerage Company announced the construction and exploitation of 250 thousand cubic meters of new drinking water storage tank in Tehran Province by the end of 2024.
The deputy director of water exploitation and development of the water and sewerage company of Tehran province said: the disruption and failure of water supply in some cities of Tehran province was caused by the sudden heat wave entering Tehran province, because all the water supply systems in Tehran province until that moment were not suitable for cool conditions and temperatures. It was regulated at least from surface water sources.