Removing production bottlenecks at Jam Petrochemical; increasing capacity and reducing the risk of emergency shutdowns

Removing production bottlenecks at Jam Petrochemical; increasing capacity and reducing the risk of emergency shutdowns

Removing production bottlenecks at Jam Petrochemical; Increasing capacity and reducing the risk of emergency shutdowns. With the new approach of Jam Petrochemical management in improving productivity and eliminating production bottlenecks, the project of installing and operating the strategic CE-8005A equipment as a parallel dryer in the polyethylene unit came to fruition and yielded significant results in production capacity and sustainability.