Exemptions from the Ministry of Energy for industrial towns with solar power plants
According to Energy Press report, Mahmoud Kamani said before noon today, May 26, in a meeting with the Deputy Minister of Roads and Urban Development on the sidelines of the Kerman IDEX 2024 conference: The land transfer permit for about 2000 megawatts of electricity has been given to Kerman, and all the inquiries have been made for the construction of the power plant. Solar is excluded except for the environment.
The Deputy Minister of Energy stated: Industrial settlements have been created to facilitate work for the people, and the price of land for solar power plants should not be high, and the settlements must be built with the agreement of Satba.
By stating that the settlements should be built based on the capacity of each region, he clarified: Farmers who use up to 80% of their electricity consumption from renewable energy are exempt from the cost of electricity consumption for four months, but the amount of water extraction must be according to be a butterfly
In this meeting, Habibi, CEO of Kerman Regional Electricity Company, stated that Kerman is one of the leading provinces in renewable energy.
Tags:Energy
- Comments sent by you will be published after approval by site administrators.
- Comments that contain slander will not be published.
- Comments that are not in Persian or not related to the news will not be published.
Comments
Total comments : 0 Awaiting review : 0 Date: 0