Stopping oil production in Salman field
According to Energy Press, quoted by the Continental Plateau Oil Company, Mahmoudreza Haghighi said: These repairs include the replacement and modification of a part of the Mashal pipelines that were severely cracked, as well as several parts of the pipeline network and a number of important valves in the production process. It includes oil, gas and water injection, which cannot be repaired if the platform is in service.
He stated that the planning for estimating the goods, the workload and the equipment of the executive team required started about a year ago and after the preparation of the necessary requirements and permits in this field, he said: All stages of this major repair operation including off-line Building the entire process of the platform, emptying the contents of the pipe network, washing, securing, speding, cutting, separating, assembling, welding, grinding, returning the tracks to the original state, resuming production and restarting the platform process by the operation, repairs, HSE, inspection executive group. Technical, maritime operations, procurement of goods and services of the region are carried out in sea and land sectors.
Tags:oil
- Comments sent by you will be published after approval by site administrators.
- Comments that contain slander will not be published.
- Comments that are not in Persian or not related to the news will not be published.
Comments
Total comments : 0 Awaiting review : 0 Date: 0