{"id":2949,"date":"2025-01-18T19:22:22","date_gmt":"2025-01-18T15:52:22","guid":{"rendered":"https:\/\/energypress.ir\/en\/?p=2949"},"modified":"2025-01-18T23:24:05","modified_gmt":"2025-01-18T19:54:05","slug":"an-important-step-has-been-taken-to-launch-the-urea-petrochemical-unit-at-hengam","status":"publish","type":"post","link":"https:\/\/energypress.ir\/en\/an-important-step-has-been-taken-to-launch-the-urea-petrochemical-unit-at-hengam\/","title":{"rendered":"An important step has been taken to launch the Urea Petrochemical Unit at Hengam"},"content":{"rendered":"<p>According to Energy Press, citing Hengam Petrochemical Public Relations, after the launch of the urea substation in the past 3 months, Hengam Petrochemical specialists succeeded in completing the last puzzle of ancillary services.<br \/>\nOf the 15 utility and ancillary services required to launch the urea unit, the cooling water lines were the last puzzle of the pre-launch operations of this section.<br \/>\nWith the completion and launch of ancillary services and the arrival of the synthesis unit reactor, Hengam Urea can soon be seen in the Assaluyeh Energy Hub.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>According to Energy Press, citing Hengam Petrochemical Public Relations, after the launch of the urea substation in the past 3 months, Hengam Petrochemical specialists succeeded in completing the last puzzle of ancillary services. Of the 15 utility and ancillary services required to launch the urea unit, the cooling water lines were the last puzzle of<\/p>\n","protected":false},"author":2,"featured_media":2950,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,112],"tags":[117],"class_list":["post-2949","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-petrochemical","category-top-slider","tag-petrochemical"],"_links":{"self":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts\/2949","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/comments?post=2949"}],"version-history":[{"count":1,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts\/2949\/revisions"}],"predecessor-version":[{"id":2951,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts\/2949\/revisions\/2951"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/media\/2950"}],"wp:attachment":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/media?parent=2949"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/categories?post=2949"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/tags?post=2949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}