{"id":2082,"date":"2024-10-01T19:05:39","date_gmt":"2024-10-01T15:35:39","guid":{"rendered":"https:\/\/energypress.ir\/en\/?p=2082"},"modified":"2024-10-01T23:07:32","modified_gmt":"2024-10-01T19:37:32","slug":"import-of-the-main-equipment-of-the-first-phase-of-the-badr-sharq-petrochemical-project","status":"publish","type":"post","link":"https:\/\/energypress.ir\/en\/import-of-the-main-equipment-of-the-first-phase-of-the-badr-sharq-petrochemical-project\/","title":{"rendered":"Import of the main equipment of the first phase of the Badr Sharq Petrochemical Project"},"content":{"rendered":"<p>According to Energy Press, citing Badr Sharq Petrochemical Company, after extensive consultations by Behzad Ansari, the CEO of this company, with manufacturers of control systems, compressor sings, process pumps, hand valves, ESDV and MOV solenoid valves abroad, the operation of transporting this The equipment for Badr Sharq petrochemical project site will start soon.<br \/>\nAccording to Ansari, the control system of the methanol unit of the Badr Sharq Petrochemical Project, which was designed and built by well-known foreign manufacturers, will be loaded and transported to Iran this week after factory tests and ensuring its correct operation.<br \/>\nAlso, the largest methanol unit compressor of this project (Sings compressor) is ready to perform functional tests and finalize the assembly steps in China, which is planned and after the necessary tests, it will be transported to the project site.<br \/>\n10 process pumps are among the other manufactured items of the methanol unit of the Badr Sharq Petrochemical Project in China, the inspection procedures of the pumps are currently underway and they will be transported to the site soon.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>According to Energy Press, citing Badr Sharq Petrochemical Company, after extensive consultations by Behzad Ansari, the CEO of this company, with manufacturers of control systems, compressor sings, process pumps, hand valves, ESDV and MOV solenoid valves abroad, the operation of transporting this The equipment for Badr Sharq petrochemical project site will start soon. According to<\/p>\n","protected":false},"author":2,"featured_media":2083,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,112],"tags":[362],"class_list":["post-2082","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-petrochemical","category-top-slider","tag-badr"],"_links":{"self":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts\/2082","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/comments?post=2082"}],"version-history":[{"count":1,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts\/2082\/revisions"}],"predecessor-version":[{"id":2084,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts\/2082\/revisions\/2084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/media\/2083"}],"wp:attachment":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/media?parent=2082"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/categories?post=2082"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/tags?post=2082"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}