{"id":1276,"date":"2024-06-15T19:40:46","date_gmt":"2024-06-15T16:10:46","guid":{"rendered":"https:\/\/energypress.ir\/en\/?p=1276"},"modified":"2024-06-15T23:43:13","modified_gmt":"2024-06-15T20:13:13","slug":"power-cut-of-16-high-consumption-offices-in-tehran","status":"publish","type":"post","link":"https:\/\/energypress.ir\/en\/power-cut-of-16-high-consumption-offices-in-tehran\/","title":{"rendered":"Power cut of 16 high consumption offices in Tehran"},"content":{"rendered":"<p>According to the report of Energy Press, following the warnings given regarding the necessity of complying with the government&#8217;s decision to require departments and executive bodies to reduce electricity consumption, by identifying the departments that did not cooperate in this regard on Saturday; On June 26, the electricity of 16 high-consuming national and provincial offices in Tehran, including several buildings of the country&#8217;s operating banks, was cut off with a prior warning.<\/p>\n<p>The electricity consumption of all offices and executive bodies of Tehran city is being monitored remotely through meters and smart systems, and in case of non-compliance with the notified resolution, the electricity of the high-consuming offices will be turned off in order to maintain the stability of the electricity distribution network and ensure the comfort of the compatriots. , it will be cut without compromise.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>According to the report of Energy Press, following the warnings given regarding the necessity of complying with the government&#8217;s decision to require departments and executive bodies to reduce electricity consumption, by identifying the departments that did not cooperate in this regard on Saturday; On June 26, the electricity of 16 high-consuming national and provincial offices<\/p>\n","protected":false},"author":2,"featured_media":1277,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[285],"class_list":["post-1276","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-news","tag-power"],"_links":{"self":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts\/1276","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/comments?post=1276"}],"version-history":[{"count":1,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts\/1276\/revisions"}],"predecessor-version":[{"id":1278,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/posts\/1276\/revisions\/1278"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/media\/1277"}],"wp:attachment":[{"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/media?parent=1276"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/categories?post=1276"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energypress.ir\/en\/wp-json\/wp\/v2\/tags?post=1276"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}